Babylon Boat Works
  • Home New
    • Home Old
  • Current Projects
    • 1978 Secraft Center Console
    • 1978 23 Mako
    • 1987 Cape Dory 28
    • 1981 15' Answer
  • Completed Projects
    • 1988 20' Boston Whaler Outrage
    • 1988 Boston Whaler Outrage
    • 1984 22' Boston Whaler Outrage
    • 1988 Boston Whaler 22 Outrage
    • 1969 Pacemaker Alglass Wahoo
    • 1972 22 Mako Restoration
    • 1979 23 Mako "Special K's"
    • 1979 23' Mako Restoration
    • 23 Mako Dec 2010
    • Skimmer Dec 2009
  • Marine Fabrication
    • Starboard
    • Aluminum & Stainless Steel
    • Fiberglass
  • BBW TV
  • About Us
  • The Cast
  • Contact Us
    • Ask Us

Tank Installation

1/31/2011

1 Comment

 
Picture
We foamed the tank into place with 4 pound foam from U.S. Composites. This foam is hard as a rock and will not absorb water. It is locked into place and we are now ready to install the coffin cover. Pete Johnston will do that tomorrow and seal the seam with cabosil filler. We will counter sink the coffin screws and also seal them with epoxy so that no water can enter the tank area.

Picture
Here is Carlos working his butt off scraping the bottom of the boat by hand. This is the only way that all old paint can be removed without damaging the gel coat finish. He uses a hand scraper to remove old layers of paint and then sands with 80 grit to get it down to the gel coat with no voids. 

Picture
This is the business end of the tank all organized to be within the opening of the inspection hatch of the tank coffin cover. Fill pipe, pick up tube opening, sender opening and vent pipe left to right. All connections will be made with top quality components. Tomorrow I will install the vent and fill hoses and sender. I will complete the pick up plumbing when the boat is back from painting.

Picture
Today we installed the new gas tank. It was a big job but we got it done. The new tank made by Phil at Alloy Welding fit like a glove. It is 115 gallons and powder coated. Here it is nestled into the coffin and screwed into place waiting for the foam bedding.

1 Comment

Master of Fiberglass

1/6/2011

0 Comments

 
Picture
Today we got Pete Johnston into action. He is the master of fiberglass. Pete sanded all the dings and holes and then applied cabosil and began plugging all holes. Tomorrow he will continue the process. I sanded what teak will be put back on the boat, the anchor locker hatch, console hatch, console radio box and the trim for the console glove box.

0 Comments

Plumbing

1/5/2011

2 Comments

 
Picture
The outside fittings for the lower drain, the Garboard drain plug to empty the bilge when out of water and the upper drain farthest to the right. All through hull and through bait well mushrooms were bedded with 5200. The two fittings on the upper end of the well for incoming and outgoing are Marelon. 1/2 inch for incoming water from the pump and 1 1/4 outflow for the top drain.

Picture
This is a shot of the two drains for the live well. The one on the left is the passive drain from the bottom of the tank. It is 1 inch diameter. I installed a one inch extra length through hull bronze mushroom with full flow Groco ball valve and full flow nipple and connected the hose to the bottom drain of the tank.
On the right is the passive top drain. This drain keeps water from flowing out of the lid of the bait well under pressure from the pump. I did it in 1 1/4 inch to make sure the water would flow well with minimum pitch. It works great on my boat so I am sure it will work on Tony's boat as well.


Picture
For the water pick up I installed a clamshell South Bay Strainer through the hull with a half inch sea cock ball valve and 5/8 high pressure tubing.

Picture
I did a bunch of work on Tony's boat the past few days. It was all about plumbing. Here is the bait well pump installed in the aft battery box on the port side. This pump has served me well over the years. I run it all day and it lasts for years. It eats up seaweed so there is never a plugged up pump. 

2 Comments

    23 Mako Dec 2010

    This boat was a complete reconstruction. New fuel tank, all fiberglass repaired, new wiring, all new hardware and plumbing, starboard replacement of almost all original teak, new console new rub rail, grab rail, trim tabs, live well system, leaning post, complete bottom sanding and painting with Micron Extra and a complete Awl Grip paint both topside and hull. New Lowrance electronics and a new Mercury OptiMax engine with new gauges and harnesses were added to finish the job.

    Archives

    March 2011
    February 2011
    January 2011
    December 2010

    Categories

    All

    RSS Feed